Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Rotterdam subway; description of new 6 km long subway line, its viaducts, river crossing tunnel, and station; since groundwater level in Rotterdam is at depth of 2 m only, land portion of line was designed as canal excavated between sheet, and piles reinforced concrete tunnel sections 6× 10× 50 to m long were prefabricated in drydocks and installed by floating and sinking techniques also used for construction of river crossing tunnel. (22927)
Rotterdam subway; description of new 6 km long subway line, its viaducts, river crossing tunnel, and station; since groundwater level in Rotterdam is at depth of 2 m only, land portion of line was designed as canal excavated between sheet, and piles reinforced concrete tunnel sections 6× 10× 50 to m long were prefabricated in drydocks and installed by floating and sinking techniques also used for construction of river crossing tunnel. (22927)
Le metro de Rotterdam
Le metro de Rotterdam
Dubourg, L. (Autor:in)
1968
11 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1965
Rotterdam builds new metro line
British Library Online Contents | 1995
Mit Tram und Metro durch Rotterdam
IuD Bahn | 2011
|Concrete trough-girder bridge for Rotterdam metro
British Library Conference Proceedings | 1998
|