Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Processed talus serves as fill
On site talus deposits supply core and shell zone material for Round Butte Dam, 440-ft-high rock and earth-fill structure under construction on Deschutes River near Madras, Ore; processed talus furnished most of impervious core zone material; dam's rock shell is combination of processed talus and quarried rock; machinery used to dig into talus and processing plant are described. (see also Eng News-Rec v 172 n 13 Mar 26 1964 p 28-30)
Processed talus serves as fill
On site talus deposits supply core and shell zone material for Round Butte Dam, 440-ft-high rock and earth-fill structure under construction on Deschutes River near Madras, Ore; processed talus furnished most of impervious core zone material; dam's rock shell is combination of processed talus and quarried rock; machinery used to dig into talus and processing plant are described. (see also Eng News-Rec v 172 n 13 Mar 26 1964 p 28-30)
Processed talus serves as fill
Construction Methods Equipment
1964
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Processed talus serves as fill
Engineering Index Backfile | 1964
British Library Online Contents | 2001
|Talus Royal(R) on A83 motorway
Online Contents | 2001
|Stability of Talus Slope at Lewistown Narrows
British Library Conference Proceedings | 2000
|Situation & Prospect of Research on Talus Slope
Tema Archiv | 2013
|