Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Job-built units at Fontenelle dam
Sprinklers and compactor were developed to speed earthfill structure being built by Bureau of Reclamation in Wyoming; sprinklers solve problem of maintaining proper moisture in impervious fill by throwing 80-ft wide stream of water; compactor consists of 2 dual 25-ton sheepsfoot rollers powered by tractor; unit moves forward and backward without turning.
Job-built units at Fontenelle dam
Sprinklers and compactor were developed to speed earthfill structure being built by Bureau of Reclamation in Wyoming; sprinklers solve problem of maintaining proper moisture in impervious fill by throwing 80-ft wide stream of water; compactor consists of 2 dual 25-ton sheepsfoot rollers powered by tractor; unit moves forward and backward without turning.
Job-built units at Fontenelle dam
Western Construction
Mendenhall, B.L. (Autor:in)
Western Construction ; 39
1964
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Thermal Monitoring for Seepage at Fontenelle Dam
British Library Conference Proceedings | 1997
|MONITORING PERFORMANCE OF THE FONTENELLE DAM CUTOFF WALL
British Library Conference Proceedings | 1995
|The Fontenelle Dam Incident: Investigation, Likely Causes, and Lessons (Eventually) Learned
British Library Conference Proceedings | 2011
|Bureau of reclamation experience in stabilizing embankment of Fontenelle earth dam
Engineering Index Backfile | 1967
|