Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Beam erection system saves time and money
Unusual method used in erection of prestressed concrete beams for bridge spanning Miramichi River in New Brunswick is described; 60 ton 128 ft prestressed concrete beams were hauled over temporary wooden structure to pier surface.
Beam erection system saves time and money
Unusual method used in erection of prestressed concrete beams for bridge spanning Miramichi River in New Brunswick is described; 60 ton 128 ft prestressed concrete beams were hauled over temporary wooden structure to pier surface.
Beam erection system saves time and money
Eng Contract Rec
Laflamme, J. (Autor:in)
1964
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Scaffold system saves time and money
British Library Online Contents | 2013
Tensar wall system saves time and money
British Library Online Contents | 2005
Floor Cleaning Equipment Saves Time, Money
Taylor & Francis Verlag | 1962
|Cutting corners saves time and money
British Library Online Contents | 2012
|Composite fuselage saves time and money
British Library Online Contents | 2000