Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Comprehensive program of Turnpike Authority to investigate and rehabilitate concrete deck of Passaic River Bridge; maintenance of deck slab failures which occurred in approach spans of 6 1/2 in. reinforced concrete deck caused by surface spalling is described.
Comprehensive program of Turnpike Authority to investigate and rehabilitate concrete deck of Passaic River Bridge; maintenance of deck slab failures which occurred in approach spans of 6 1/2 in. reinforced concrete deck caused by surface spalling is described.
Bridge deck repair techniques on New Jersey turnpike
Nat Research Council -- Highway Research Board -- Research Rec
Riley, O. (Autor:in)
1963
12 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1951
|Engineering Index Backfile | 1952
Engineering Index Backfile | 1952
|Integrated bridge inspection and management software for New Jersey Turnpike Authority
British Library Conference Proceedings | 2010
|