Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Substructure for new bridge over Ottawa River, Ont consists of 2 massive abutments and 4 tall piers; steel bearing piles were driven to rock to support retaining walls of abutment; reinforced concrete pneumatic caissons were built on specially designed barge; launching cofferdam built of large panels made of steel frame with wood sheathing was bolted to caissons.
Substructure for new bridge over Ottawa River, Ont consists of 2 massive abutments and 4 tall piers; steel bearing piles were driven to rock to support retaining walls of abutment; reinforced concrete pneumatic caissons were built on specially designed barge; launching cofferdam built of large panels made of steel frame with wood sheathing was bolted to caissons.
Macdonald-cartier bridge provides new hull-Ottawa crossing
Eng Contract Rec
Chung, R. (Autor:in)
1964
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Ceremonial Routes, Ottawa-Hull
Online Contents | 1998
|British Library Conference Proceedings | 1997
|Resource Management of Bridge Deck Rehabilitation: Jacques Cartier Bridge Case Study
Online Contents | 2008
|Resource Management of Bridge Deck Rehabilitation: Jacques Cartier Bridge Case Study
British Library Online Contents | 2008
|Cofferdam at mile 6 Quebec Cartier Mining Railroad, Port Cartier, Quebec
Engineering Index Backfile | 1960
|