Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Features of storage basin, dam, flood release, intake structures, tunnel, surge tanks, pressure tubes, and powerhouses located in underground chamber 34 m high, 20 m wide, and 114. m long.
Features of storage basin, dam, flood release, intake structures, tunnel, surge tanks, pressure tubes, and powerhouses located in underground chamber 34 m high, 20 m wide, and 114. m long.
Construction of jablanica hydroelectric power plant on Neretva river in Yugoslavia
Ausbau des Speicherwerkes Jablanica, der ersten Wasserkraftanlage im Flussystem Neretva in Jugoslawien
Caric, D. (Autor:in)
Bauingenieur ; 30
1955
7 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2011
|SALINITY AND PHYSICOCHEMICAL WATER PARAMETERS OF THE LOWER FLOW OF NERETVA RIVER
DOAJ | 2017
|Hydroelectric power plant and dam under construction on Rhone river at Geneva
Engineering Index Backfile | 1942
|Krasnoyarsk hydroelectric power plant construction, a new phase of hydroelectric development
Springer Verlag | 1970
Krasnoyarsk hydroelectric power plant construction, a new phase of hydroelectric development
Online Contents | 1970