Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design features of bear river hydroelectric project
Plant 120 mi due east of San Francisco includes 230 ft high rock fill dam, combination surge tank and creek diversion, 2110 ft head penstock and multiple jet vertical shaft impulse turbine; illustrated description of design features.
Design features of bear river hydroelectric project
Plant 120 mi due east of San Francisco includes 230 ft high rock fill dam, combination surge tank and creek diversion, 2110 ft head penstock and multiple jet vertical shaft impulse turbine; illustrated description of design features.
Design features of bear river hydroelectric project
Am Soc Civ Engrs -- Proc Separate
Cooke, I.B. (Autor:in)
1955
17 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Unusual design features distinguish hydroelectric project in Peru
Engineering Index Backfile | 1944
Unusual design features distinguish hydroelectric project in Peru
Engineering Index Backfile | 1944
British Library Conference Proceedings | 2018
|Teesta Hydroelectric Project (Stage-V) - Salient Features
British Library Conference Proceedings | 1998
|Layout and design features of Dhauliganga hydroelectric project, stage-I
British Library Online Contents | 2006
|