Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wet weather grading problems on high speed road project
Review of some problems in grading 69-mi Maine Turnpike extension under adverse circumstances; extension is being built with depressed median and 3-ft thick flexible bituminous pavement; grading specifications for excavation and embankment; new 60 cu yd stripping shovel used which can move 100 tons of earth every 50 sec.
Wet weather grading problems on high speed road project
Review of some problems in grading 69-mi Maine Turnpike extension under adverse circumstances; extension is being built with depressed median and 3-ft thick flexible bituminous pavement; grading specifications for excavation and embankment; new 60 cu yd stripping shovel used which can move 100 tons of earth every 50 sec.
Wet weather grading problems on high speed road project
World Construction
1955
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1947
|Alignment, grading and road structures
Engineering Index Backfile | 1930
|Hollywood parkway grading project
Engineering Index Backfile | 1949
|