Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundry building of pre-cast concrete members
Building, 267 ft wide by 500 ft long, built at Nuneaton, Warwickshire, as extension to iron foundry premises of Sterling Metals Ltd; roofs are pitched at 22 1/2° and roof cladding consists of aluminum alloy sheeting, fixed to purlins; contributory reasons for selecting concrete members was, apart from speed of construction possible, resistance to corrosive atmosphere.
Foundry building of pre-cast concrete members
Building, 267 ft wide by 500 ft long, built at Nuneaton, Warwickshire, as extension to iron foundry premises of Sterling Metals Ltd; roofs are pitched at 22 1/2° and roof cladding consists of aluminum alloy sheeting, fixed to purlins; contributory reasons for selecting concrete members was, apart from speed of construction possible, resistance to corrosive atmosphere.
Foundry building of pre-cast concrete members
Engineering
Engineering ; 180
1955
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
A concrete foundry building in Germany
Engineering Index Backfile | 1909
|Connecting pre-cast reinforced concrete members
Engineering Index Backfile | 1941
Cast-in-place concrete connects precast members
Engineering Index Backfile | 1966
|Cast iron manhole covers - foundry artifacts
Tema Archiv | 1979
Strength of concrete members cast in deep forms
UB Braunschweig | 1969
|