Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hydraulic design of pump station 5a Central and southern Florida project
Station will provide water control for West Palm Beach Canal by removing excess rainfall from canal at rate of 4610 cu ft per sec with average static head of 9.2 ft; data on existing and ultimate land use; pump capacities of existing drainage districts; determination of pump station characteristics required for satisfactory water control presented.
Hydraulic design of pump station 5a Central and southern Florida project
Station will provide water control for West Palm Beach Canal by removing excess rainfall from canal at rate of 4610 cu ft per sec with average static head of 9.2 ft; data on existing and ultimate land use; pump capacities of existing drainage districts; determination of pump station characteristics required for satisfactory water control presented.
Hydraulic design of pump station 5a Central and southern Florida project
Am Soc Civ Engrs -- Proc Separate
Eden, Jr., E.W. (Autor:in)
1955
17 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydrology characteristics: Central and Southern Florida project
Engineering Index Backfile | 1954
|Summary of Central and Southern Florida flood control project
Engineering Index Backfile | 1950
Hurricane Andrew and the Central and Southern Florida Project
British Library Conference Proceedings | 1994
|Unusual foundation conditions encountered on Central and Southern Florida project
Engineering Index Backfile | 1953
|Design rainfall -- Central and south Florida project
Engineering Index Backfile | 1954
|