"Dredge in the cornfield" cuts cost of runway extension
Unusual hydraulic filling operation and ingenious "overland" moving-in procedure for dredging equipment was required for runway extension at Offutt Air Force Base, Neb; grading and paving; fill compaction; nine 36-in. concrete culvert pipes, each 658 ft long, provides drainage of water impounded by new fill.
"Dredge in the cornfield" cuts cost of runway extension
Unusual hydraulic filling operation and ingenious "overland" moving-in procedure for dredging equipment was required for runway extension at Offutt Air Force Base, Neb; grading and paving; fill compaction; nine 36-in. concrete culvert pipes, each 658 ft long, provides drainage of water impounded by new fill.
"Dredge in the cornfield" cuts cost of runway extension
Roads Streets
Roads and Streets ; 98
1955
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Line stabilization cuts runway costs