Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Press-water required in testing large mains
Quantity of press water required varies with size and materials of construction of pipes and with pressure; official tests on part of Ribble Siphon of Fourth Thirlmere pipe line in 1924; official test at working pressure. (See also Instn. Civil Engrs no. 4, May 1928 pp. 107-109)
Press-water required in testing large mains
Quantity of press water required varies with size and materials of construction of pipes and with pressure; official tests on part of Ribble Siphon of Fourth Thirlmere pipe line in 1924; official test at working pressure. (See also Instn. Civil Engrs no. 4, May 1928 pp. 107-109)
Press-water required in testing large mains
Surveyor
Sparrow, C.S. (Autor:in)
1928
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Press-water required in testing large mains
Engineering Index Backfile | 1928
|Time required for restoring accidents of water mains
Engineering Index Backfile | 1935
|Reconditioning large water mains
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1944
|Steel Pipe for Large Water Mains
Wiley | 1923
|