Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Falsework on wheels places railroad bridge in halves
Bridge replacement on Central Railroad of New Jersey at Newark, N. J, using timber falsework traveling on wheels to carry completely assembled halves of new 6-track, 1050-ton steel plate girder railroad bridge with concrete deck; temporary track changes during demolition and replacement of bridge.
Falsework on wheels places railroad bridge in halves
Bridge replacement on Central Railroad of New Jersey at Newark, N. J, using timber falsework traveling on wheels to carry completely assembled halves of new 6-track, 1050-ton steel plate girder railroad bridge with concrete deck; temporary track changes during demolition and replacement of bridge.
Falsework on wheels places railroad bridge in halves
Construction Methods
1936
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Ingenious bridge erection reduces falsework
Engineering Index Backfile | 1929
Bridge Truss acts as falsework
Engineering Index Backfile | 1962
|Bridge Falsework Productivity-Measurement and Influences
British Library Online Contents | 2003
|Fancy falsework, forms for bridge
Engineering Index Backfile | 1949
Low-cost falsework for arch bridge
Engineering Index Backfile | 1950
|