Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Unique dam completed with South America's largest construction plant
Description of Brazil's Peixoto Hydroelectric Project on Rio Grande River; project will have ultimate installed capacity of 400,000 kw; design of dam includes two gravity sections connected by arch dam section; highest point above bedrock, 200 ft, is in arch section.
Unique dam completed with South America's largest construction plant
Description of Brazil's Peixoto Hydroelectric Project on Rio Grande River; project will have ultimate installed capacity of 400,000 kw; design of dam includes two gravity sections connected by arch dam section; highest point above bedrock, 200 ft, is in arch section.
Unique dam completed with South America's largest construction plant
Civ Eng (NY)
Olafsen, R. (Autor:in) / Pett, J.F. (Autor:in)
Civil Engineering ; 27
1957
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Largest moving job successfully completed
Engineering Index Backfile | 1929
Largest moving job successfully completed
Engineering Index Backfile | 1929
Nation's largest parking building completed
Engineering Index Backfile | 1952
Engineering Index Backfile | 1909