Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Asphalt mattress bank protection
Trials on Suez Canal for protecting it against erosion; continuous asphalt mattress prepared with locally available equipment; slabs precast in steel frames; lower section provided with steel pins to hold welded steel net of 1.5 mm wire and 4 cm mesh; three sides of frame fixed to concrete laying base, remaining side being adjustable; six steel cables stretched across each series of seven frames.
Asphalt mattress bank protection
Trials on Suez Canal for protecting it against erosion; continuous asphalt mattress prepared with locally available equipment; slabs precast in steel frames; lower section provided with steel pins to hold welded steel net of 1.5 mm wire and 4 cm mesh; three sides of frame fixed to concrete laying base, remaining side being adjustable; six steel cables stretched across each series of seven frames.
Asphalt mattress bank protection
World Construction
World Construction ; 10
1957
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|Development of asphalt mattress
Engineering Index Backfile | 1935
|Gabion-Mattress Channel-Protection Design
Online Contents | 1995
|