Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated reconstruction of railway bridge
Bridge on London Midland Region has skew span of 47 ft 11 in. center to center of bearings, and is constructed in two halves; each half is of through type carrying one-line track on ballast, thus constituting two separate bridges side by side; each structure consists of two welded steel main girders with rolled steel joist cross beams encased in concrete spanning between them.
Prefabricated reconstruction of railway bridge
Bridge on London Midland Region has skew span of 47 ft 11 in. center to center of bearings, and is constructed in two halves; each half is of through type carrying one-line track on ballast, thus constituting two separate bridges side by side; each structure consists of two welded steel main girders with rolled steel joist cross beams encased in concrete spanning between them.
Prefabricated reconstruction of railway bridge
Civ Structural Engrs Rev
1957
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
Prefabricated bridge assembly, prefabricated bridge and construction method of prefabricated bridge
Europäisches Patentamt | 2023
|Reconstruction of railway bridge
Engineering Index Backfile | 1954
Belgian railway bridge reconstruction
Engineering Index Backfile | 1947
|Prestress connecting device of railway prefabricated assembly type bridge pier
Europäisches Patentamt | 2021
|