Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of deck girder bridge over Snake River, Idaho, requiring piers 90 ft high and spans 536 ft between abutments; tower leaned 25 ft either side of centerline; leaning accomplished with hand winches. (see also unsigned article in Roads and Streets v 100 n 5 May 1957 p 145-6, 149)
Construction of deck girder bridge over Snake River, Idaho, requiring piers 90 ft high and spans 536 ft between abutments; tower leaned 25 ft either side of centerline; leaning accomplished with hand winches. (see also unsigned article in Roads and Streets v 100 n 5 May 1957 p 145-6, 149)
Bridge girders set by high-line
World Construction
Glidden, H.K. (Autor:in)
World Construction ; 10
1957
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge girders set by high-line
Engineering Index Backfile | 1957
|High girders bridge feather river
Engineering Index Backfile | 1947
|Engineering Index Backfile | 1964
|Innovative High Performance Steel Bridge Girders
ASCE | 2001
|Engineering Index Backfile | 1928
|