Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete bridge across lake Pontchartrain completed in record time
Bridge has 2215 identical bents which account for 98% of its length; each bent consists of two piles, cap, and slab; 30-ton piles are 54 in. in diam; cast-in-place concrete used to make connection between cap and piles; each slab was cast integrally with seven longitudinal prestressed beams. See also Engineering Index 1956 p 138, under Bridges, Concrete -- Prestressed.
Concrete bridge across lake Pontchartrain completed in record time
Bridge has 2215 identical bents which account for 98% of its length; each bent consists of two piles, cap, and slab; 30-ton piles are 54 in. in diam; cast-in-place concrete used to make connection between cap and piles; each slab was cast integrally with seven longitudinal prestressed beams. See also Engineering Index 1956 p 138, under Bridges, Concrete -- Prestressed.
Concrete bridge across lake Pontchartrain completed in record time
Civ Eng (NY)
Van Buren, M. (Autor:in)
Civil Engineering ; 27
1957
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
$5,500,000 bridge completed across lake pontchartrain
Engineering Index Backfile | 1928
Concrete bridge across Lake Pontchartrain
Engineering Index Backfile | 1961
|Concrete trestle across lake Pontchartrain
Engineering Index Backfile | 1928
Longest vehicular bridge starts across Lake Pontchartrain
Engineering Index Backfile | 1955
|Surveys for lake Pontchartrain Bridge
Engineering Index Backfile | 1961
|