Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Progress of Clifton bridge, Nottingham
Main span of road bridge over River Trent is 275 ft, consisting of two cantilever arms, each of 87 ft 6 in., and suspended span of 100 ft; prestressing, according to Magnal-Blaton system, applied through cables in deck slab and in webs; suspended span consists of seven T-beams, partially prestressed. (See also Engineer v 203 n 5289 June 7 1957 p 872-3)
Progress of Clifton bridge, Nottingham
Main span of road bridge over River Trent is 275 ft, consisting of two cantilever arms, each of 87 ft 6 in., and suspended span of 100 ft; prestressing, according to Magnal-Blaton system, applied through cables in deck slab and in webs; suspended span consists of seven T-beams, partially prestressed. (See also Engineer v 203 n 5289 June 7 1957 p 872-3)
Progress of Clifton bridge, Nottingham
Roads Road Construction
1957
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Progress of Clifton bridge, Nottingham
Engineering Index Backfile | 1957
Engineering Index Backfile | 1959
|