Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prestressed concrete bridge for heavy loads
Work for power station at High Marnham, Great Britain, included bridge to carry road over new railway sidings to power station; deck is composed of 27 beams, nearly I shape, placed side by side; spaces between bottom flanges were filled with cement mortar, then concrete was placed to fill spaces between beams and form slab 3 in. thick.
Prestressed concrete bridge for heavy loads
Work for power station at High Marnham, Great Britain, included bridge to carry road over new railway sidings to power station; deck is composed of 27 beams, nearly I shape, placed side by side; spaces between bottom flanges were filled with cement mortar, then concrete was placed to fill spaces between beams and form slab 3 in. thick.
Prestressed concrete bridge for heavy loads
Concrete Constr Eng
Keith, E.A.L. (Autor:in)
1957
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
|Engineering Index Backfile | 1957
Lateral distribution of vehicular loads in prestressed concrete box-beam bridge -- Berwick bridge
Engineering Index Backfile | 1967
|Lateral distribution of static loads in prestressed concrete drehersville bridge -- 2
Engineering Index Backfile | 1967
|Lateral distribution of static loads in prestressed concrete Drehersville bridge -- 1
Engineering Index Backfile | 1966
|