Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Field measurements on composite slab girder bridge
Causeway bridge spans at Perth, Australia, incorporate composite system with nine girders; spans were analyzed by approximate methods; tests conducted to provide information with regard to transverse distribution of concentrated loads, position of neutral axis of composite section, and effect of temperature differentials on system.
Field measurements on composite slab girder bridge
Causeway bridge spans at Perth, Australia, incorporate composite system with nine girders; spans were analyzed by approximate methods; tests conducted to provide information with regard to transverse distribution of concentrated loads, position of neutral axis of composite section, and effect of temperature differentials on system.
Field measurements on composite slab girder bridge
Civ Eng (Lond)
Hondros, G. (Autor:in) / Marsh, G. (Autor:in)
Civil Engineering ; 52
1957
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
FLOOR SLAB REPLACEMENT METHOD FOR COMPOSITE GIRDER BRIDGE
Europäisches Patentamt | 2023
|Concrete slab and girder bridge
Engineering Index Backfile | 1946
|COMPOSITE GIRDER WITH STEEL SLAB AND COMPOSITE GIRDER BRIDGE CONSTRUTION METHOD USING THE SAME
Europäisches Patentamt | 2023
|