Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fully-depressed expressway planned for downtown Detroit
Planned for early construction after war, Detroit's $50,000, 000 John C. Lodge Expressway will be fully depressed throughout entire 12-mi length. (see also Arch Forum v 83 n 3 Sept 1945 p 125-9)
Fully-depressed expressway planned for downtown Detroit
Planned for early construction after war, Detroit's $50,000, 000 John C. Lodge Expressway will be fully depressed throughout entire 12-mi length. (see also Arch Forum v 83 n 3 Sept 1945 p 125-9)
Fully-depressed expressway planned for downtown Detroit
Eng News-Rec
Engineering News-Record ; 134
1945
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Fully-depressed expressway planned for downtown Detroit
Engineering Index Backfile | 1945
Engineering Index Backfile | 1944
Outlook brightens for downtown Detroit
Online Contents | 1996
John C. Lodge expressway, Detroit
Engineering Index Backfile | 1944
|Dream city: creation, destruction, and reinvention in downtown Detroit
Taylor & Francis Verlag | 2022
|