Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Central valley project
Illustrated description of what has been accomplished in past 2 yr in reclamation project in California; effect of gold mining operations; control of Sacramento River; river control in San Joaquin Valley; Shasta Dam; drum gates; concrete construction; railway diversion; power house at Shasta Dam; Keswick and Friant Dams; recovery of gold. (See also - n 4656 Apr 6 1945 p 264-7, n 4657 Apr 13 p 284-7, n 4658 Apr 20 p 304-5, n 4659 Apr 27 p 324-7, n 4660 May 4 p 344-6)
Central valley project
Illustrated description of what has been accomplished in past 2 yr in reclamation project in California; effect of gold mining operations; control of Sacramento River; river control in San Joaquin Valley; Shasta Dam; drum gates; concrete construction; railway diversion; power house at Shasta Dam; Keswick and Friant Dams; recovery of gold. (See also - n 4656 Apr 6 1945 p 264-7, n 4657 Apr 13 p 284-7, n 4658 Apr 20 p 304-5, n 4659 Apr 27 p 324-7, n 4660 May 4 p 344-6)
Central valley project
Engineer
Engineer ; 179
1945
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1942
Engineering Index Backfile | 1941
Central valley project important
Engineering Index Backfile | 1935
|Importance of Central valley project
Engineering Index Backfile | 1935
|Central valley project of California
Engineering Index Backfile | 1934
|