Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Utilization development, plans for which were described in papers indexed in Engineering Index 1929 p 960, from various sources, under Hydroelectric Power Developments -- Spain; main construction work was done from 1929 to 1933; construction of spillway tunnel was started in 1936, because of flood damage to spillway canal.
Utilization development, plans for which were described in papers indexed in Engineering Index 1929 p 960, from various sources, under Hydroelectric Power Developments -- Spain; main construction work was done from 1929 to 1933; construction of spillway tunnel was started in 1936, because of flood damage to spillway canal.
Spillway tunnel of Esla falls, commonly known as "Duero Falls" of Esla River
El Tunel Aliviadero del Salto del Esla
Rubio, R. (Autor:in)
1940
5 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
Engineering Index Backfile | 1938
El Tunel Aliviadero del Salto del Esla
Engineering Index Backfile | 1941
|El hormigon de la presa del Esla
Engineering Index Backfile | 1933
|