Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Shaft sinking through overburden at Lapa Cadillac
Account of sinking about 38 ft to provide collar for shaft; two earlier attempts had been abandoned; sheet steel piling was driven, to give 3-ft clearance around old excavation; old shaft sets and material mucked out and new sets added to brace piling; mucking difficulties; water troubles; excavating in rock; concreting; work started Apr 29 1936 and completed in 66 days.
Shaft sinking through overburden at Lapa Cadillac
Account of sinking about 38 ft to provide collar for shaft; two earlier attempts had been abandoned; sheet steel piling was driven, to give 3-ft clearance around old excavation; old shaft sets and material mucked out and new sets added to brace piling; mucking difficulties; water troubles; excavating in rock; concreting; work started Apr 29 1936 and completed in 66 days.
Shaft sinking through overburden at Lapa Cadillac
Can Min J
Sharp, D.H. (Autor:in)
1940
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Shaft sinking through heavy overburden at Falconbridge
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1902
|Engineering Index Backfile | 1948
|Tema Archiv | 2013
|