Illustrated description of work in progress for covering 411 yd of river and constructing of reinforced concrete road; roadway between Mersey bridge and Lancashire bridge is to be carried on 54 portal frames, with expansion joint between each group of six portals; surface works will comprise 45-ft roadway with eight central islands and two 15-ft footpaths. See also Engineering Index 1938 p 1047. (see also French translation in Genie Civil v 116 n 3011 Apr 27 1940 p 280-2)
Illustrated description of work in progress for covering 411 yd of river and constructing of reinforced concrete road; roadway between Mersey bridge and Lancashire bridge is to be carried on 54 portal frames, with expansion joint between each group of six portals; surface works will comprise 45-ft roadway with eight central islands and two 15-ft footpaths. See also Engineering Index 1938 p 1047. (see also French translation in Genie Civil v 116 n 3011 Apr 27 1940 p 280-2)
Road over River Mersey at Stockport
Engineer
Rhodes, E. (Autor:in)
Engineer ; 169
1940
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Road over River Mersey at Stockport
Engineering Index Backfile | 1940
|Reinforced concrete road viaduct above and along course of river Mersey, Stockport
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1935
Engineering Index Backfile | 1928
Proposed bridge over the Mersey River at Liverpool
Engineering Index Backfile | 1893
|