Mass production methods for building Siphons along Coachella canal
Outline of standardized procedure for step-by-step construction of 32 siphons on branch of All-American Canal being built by Bureau of Reclamation at contract cost of $2,279,000; dikes and drainage system; forms for warped sections.
Mass production methods for building Siphons along Coachella canal
Outline of standardized procedure for step-by-step construction of 32 siphons on branch of All-American Canal being built by Bureau of Reclamation at contract cost of $2,279,000; dikes and drainage system; forms for warped sections.
Mass production methods for building Siphons along Coachella canal
Western Construction News
1940
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Dikes will protect Coachella Canal
Engineering Index Backfile | 1948
|Coachella canal -- Excavation and lining 141-mi. Canal
Engineering Index Backfile | 1946
|Engineering Index Backfile | 1945
|Concrete-Lining the Coachella Canal Under Water
British Library Conference Proceedings | 1992
|Inverted siphons, gravity main canal
Engineering Index Backfile | 1940
|