Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Discussion of relative economy of hydraulic fill and rolled fill dams; methods and equipment used in construction of Pickwick Landing dam of Tennessee Valley Authority, combining hydraulic fill and rolled fill, totaling 2,710,000 cu yd; hydraulic fill costs; earth moving data and costs.
Discussion of relative economy of hydraulic fill and rolled fill dams; methods and equipment used in construction of Pickwick Landing dam of Tennessee Valley Authority, combining hydraulic fill and rolled fill, totaling 2,710,000 cu yd; hydraulic fill costs; earth moving data and costs.
Modern construction methods on earth dams
Civ Eng (NY)
Floyd, O.N. (Autor:in)
1940
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Modern construction methods on earth dams
Engineering Index Backfile | 1940
|Review of modern practice in construction of earth dams
Engineering Index Backfile | 1933
The construction of earth dams
Engineering Index Backfile | 1915
|