Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Miniature system of first-order alinement and triangulation control
Development of limited triangulation system of horizontal alignment control intended to supplement triangulation for measuring from time to time, direction and amount of any horizontal movements that may occur in various monoliths of Tygart River concrete gravity dam at Grafton, W Va. (See also - discussion in v 66 n 6 pt 1 June 1940 p 1133-8)
Miniature system of first-order alinement and triangulation control
Development of limited triangulation system of horizontal alignment control intended to supplement triangulation for measuring from time to time, direction and amount of any horizontal movements that may occur in various monoliths of Tygart River concrete gravity dam at Grafton, W Va. (See also - discussion in v 66 n 6 pt 1 June 1940 p 1133-8)
Miniature system of first-order alinement and triangulation control
Am Soc Civ Engrs -- Proc
Hough, F.W. (Autor:in)
1939
11 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Miniature system of first-order alinement and triangulation control
Engineering Index Backfile | 1941
|Closure to “Hough on First-Order Alinement”
ASCE | 2021
|Discussion of “Bowie on First-Order Alinement”
ASCE | 2021
|Cross Section and Alinement Design Issues
NTIS | 1994