Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Preliminary engineering at Morenci open pit
Report on operations in developing new mine estimated to yield 230, 000,000 tons of ore containing 1.06% copper. involving construction of standard gage railroad around precipitous bluffs, stripping away 42,000,000 tons of barren rock, and building modern permanent town to house workers.
Preliminary engineering at Morenci open pit
Report on operations in developing new mine estimated to yield 230, 000,000 tons of ore containing 1.06% copper. involving construction of standard gage railroad around precipitous bluffs, stripping away 42,000,000 tons of barren rock, and building modern permanent town to house workers.
Preliminary engineering at Morenci open pit
Civ Eng (NY)
Lawson, W.C. (Autor:in)
1940
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Development of Morenci open-pit mine
Engineering Index Backfile | 1940
|Morenci expands to meet war demand
Engineering Index Backfile | 1943
|Use of visual aids in morenci branch safety program, Phelps Dodge corp, Morenci, Ariz
Engineering Index Backfile | 1951
|Closure to Pumping Plant, Morenci Water Co.
ASCE | 2021
|GPS -- Now for Exploration - Morenci improves ore control
Online Contents | 1998