Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reconstruction of Menai suspension bridge
Work of redesigning entrusted to Alexander Gibb; reconstruction carried out by Dorman, Long and Co; work consisted in erection of temporary steel towers, above existing main piers, carrying cables to give partial support to existing bridge floor, and enable old outer chains of bridge to be removed and new chains and anchorages erected.
Reconstruction of Menai suspension bridge
Work of redesigning entrusted to Alexander Gibb; reconstruction carried out by Dorman, Long and Co; work consisted in erection of temporary steel towers, above existing main piers, carrying cables to give partial support to existing bridge floor, and enable old outer chains of bridge to be removed and new chains and anchorages erected.
Reconstruction of Menai suspension bridge
Engineering
Engineering ; 148
1939
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1946
|Reconstruction of Menai bridge
Engineering Index Backfile | 1937
Reconstruction of Menai bridge
Engineering Index Backfile | 1937
Menai Suspension Bridge : the first 200 years
TIBKAT | 2019
|