Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Features of Cleveland's main Avenue bridge
New steel truss bridge over Cuyahoga River consists principally of 10 spans varying in length from 200 to 400 ft; total length 2520 ft; total estimated costs including approaches $7,200,000.
Features of Cleveland's main Avenue bridge
New steel truss bridge over Cuyahoga River consists principally of 10 spans varying in length from 200 to 400 ft; total length 2520 ft; total estimated costs including approaches $7,200,000.
Features of Cleveland's main Avenue bridge
Roads Streets
McWilliams, J.O. (Autor:in) / Blaser, W.E. (Autor:in) / Plummer, F.L. (Autor:in)
Roads and Streets ; 82
1939
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1993
|Design features of Cleveland's nottingham intake
Engineering Index Backfile | 1950
|Design Features of Cleveland's Nottingham Intake
Wiley | 1950
|Engineering Index Backfile | 1932
|