Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Adding 11 ft. to top of trap-falls dam at Bridgeport
By adding mass concrete on top and supplying buttresses. (1800 w.) (75920)
Adding 11 ft. to top of trap-falls dam at Bridgeport
By adding mass concrete on top and supplying buttresses. (1800 w.) (75920)
Adding 11 ft. to top of trap-falls dam at Bridgeport
Eng News
Hirschberg, Charles A. (Autor:in)
1917
Ills.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The construction of the trap falls dam, Bridgeport, Conn
Engineering Index Backfile | 1906
Two Housing Projects, Bridgeport, Connecticut
British Library Online Contents | 1993
|Combined carhouse and shop, Bridgeport, Conn.
Engineering Index Backfile | 1911
Bridgeport Garage Gains Needed Repairs
Online Contents | 1993
Water works at Bridgeport, Conn.
Engineering Index Backfile | 1887