Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods used on roadway blasted in rock cliff 400 ft. above Hudson River. Protecting railroad from falling debris. (1600 w.) (80770)
Methods used on roadway blasted in rock cliff 400 ft. above Hudson River. Protecting railroad from falling debris. (1600 w.) (80770)
Constructing the storm King road
Mun Jl
Perkins, A.C. (Autor:in)
1917
Ills.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Storm King -- A modern road built under pioneer conditions
Engineering Index Backfile | 1923
Engineering Index Backfile | 1920
New York builds mountain highway to bypass Old Storm King Road
Engineering Index Backfile | 1940
Engineering Index Backfile | 1915
|Constructing a concrete storm sewer at Montgomery, Ala
Engineering Index Backfile | 1911
|