Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Grouting the foundation of the elephant Butte dam
Upstream row of grouted holes and two downstream rows of drainage wells serve as telltales. (2500 w.) (79600)
Grouting the foundation of the elephant Butte dam
Upstream row of grouted holes and two downstream rows of drainage wells serve as telltales. (2500 w.) (79600)
Grouting the foundation of the elephant Butte dam
Eng News-Rec
1917
Ills.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Excavation for foundation of Elephant Butte dam
Engineering Index Backfile | 1915
|Foundation Grouting for the Forks of Butte Powerhouse
British Library Conference Proceedings | 1993
|Engineering Index Backfile | 1916
Engineering Index Backfile | 1913
Elephant Butte dam construction
Engineering Index Backfile | 1913
|