Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Shield method for large railway tunnel at Berne
Use of shield method of construction without compressed air in boring tunnel within built-up area, through morainic and nocoherent ground in Switzerland where covering ranged only about 10 to 33 ft and sheets of groundwater existed at main track level; details of shielding and boring procedures.
Shield method for large railway tunnel at Berne
Use of shield method of construction without compressed air in boring tunnel within built-up area, through morainic and nocoherent ground in Switzerland where covering ranged only about 10 to 33 ft and sheets of groundwater existed at main track level; details of shielding and boring procedures.
Shield method for large railway tunnel at Berne
World Construction
Desponds, R. (Autor:in)
World Construction ; 15
1962
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Autoroute A1 Lausanne-Berne Der Tunnel von Arrissoules
Online Contents | 1998
|Results of the operation of the Berne-Loetschberg-Simplon railway
Engineering Index Backfile | 1918
Online Contents | 1994
|