Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hydraulic filling methods with marl
Methods applied by Standard Dredging Corp, New York City, using Charleston marl in building of hydraulic embankment for South Caroline I-interchange; marl as fill material after drying out formed dense and impervious embankment.
Hydraulic filling methods with marl
Methods applied by Standard Dredging Corp, New York City, using Charleston marl in building of hydraulic embankment for South Caroline I-interchange; marl as fill material after drying out formed dense and impervious embankment.
Hydraulic filling methods with marl
Roads Streets
Roads and Streets ; 105
1962
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
UB Braunschweig | 1958
|