Pipeline bridge rises in 2 days
Design of pipe line bridge for Tennessee Gas Transmission Co to cross Ohio river southeast of Portsmouth, Ohio; construction methods to raise 2 suspension bridge towers, each over 260 ft high, string and swing about 18,000 ft of 2 1/4 in. diam main bridge cable, and suspend 2300 ft of 30 in. diam pipe 104 ft above navigable stream.
Pipeline bridge rises in 2 days
Design of pipe line bridge for Tennessee Gas Transmission Co to cross Ohio river southeast of Portsmouth, Ohio; construction methods to raise 2 suspension bridge towers, each over 260 ft high, string and swing about 18,000 ft of 2 1/4 in. diam main bridge cable, and suspend 2300 ft of 30 in. diam pipe 104 ft above navigable stream.
Pipeline bridge rises in 2 days
Eng News-Rec
Engineering News-Record ; 169
1962
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New England Pipeline Capacity Rises
Online Contents | 1994
ASCE | 2016
|Online Contents | 2006
|British Library Online Contents | 2006
|Online Contents | 1995