Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Beauchastel development on Rhone (river)
Project is fourth of 5 projects on lower portion of river; river-bed dam comprises 5 piers 7 m wide each and 6 gated sluices 26 m wide each; 4.6 km long headrace canal to power plant and 1.9 km tailrace canal back to river; 12 by 195 m navigational locks; power plant comprises 6 Kaplan units of 31 Mw each; importance in flood control.
Beauchastel development on Rhone (river)
Project is fourth of 5 projects on lower portion of river; river-bed dam comprises 5 piers 7 m wide each and 6 gated sluices 26 m wide each; 4.6 km long headrace canal to power plant and 1.9 km tailrace canal back to river; 12 by 195 m navigational locks; power plant comprises 6 Kaplan units of 31 Mw each; importance in flood control.
Beauchastel development on Rhone (river)
L'amenagement de la chute de Beauchastel sur le Rhone
Tournier, G. (Autor:in)
Construction ; 16
1961
10 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1937
|Engineering Index Backfile | 1883
Mouth of Rhone river improvement
Engineering Index Backfile
|Canalization of lower Rhone River, France
Engineering Index Backfile | 1946
|