Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods and cost of constructing a concrete road in southern California
Replacing an oiled earth road with 3.62 miles of bituminous surfaced concrete pavement on a disintegrated granite base. (1200 w.) (86003)
Methods and cost of constructing a concrete road in southern California
Replacing an oiled earth road with 3.62 miles of bituminous surfaced concrete pavement on a disintegrated granite base. (1200 w.) (86003)
Methods and cost of constructing a concrete road in southern California
Eng Con
Glass, Earl (Autor:in)
1918
Ills.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Method and cost of constructing concrete road with bituminous wearing surface in California
Engineering Index Backfile | 1914
|Methods and cost of constructing a rolled concrete road in Washington
Engineering Index Backfile | 1915
Methods and cost of constructing a concrete road near mason city, Iowa
Engineering Index Backfile | 1913
Engineering Index Backfile | 1914
|Methods and cost of constructing a concrete road in La Salle Co., Illinois
Engineering Index Backfile | 1915
|