Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Constructing concrete wells in susquehanna river
Procedure used at Danville, Pa, in construction of concrete wells, to replace old cast iron ones; wells receive water from river which has filtered through several feet of sandy river bed; river turbidity of 4000 is reduced to 40.
Constructing concrete wells in susquehanna river
Procedure used at Danville, Pa, in construction of concrete wells, to replace old cast iron ones; wells receive water from river which has filtered through several feet of sandy river bed; river turbidity of 4000 is reduced to 40.
Constructing concrete wells in susquehanna river
Pub Works
Deitrick, L. (Autor:in)
Public Works ; 72
1941
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 2011
|Low concrete dam at Harrisburg across Susquehanna river
Engineering Index Backfile | 1915
Longest multiple-arch concrete highway bridge to span Susquehanna river
Engineering Index Backfile | 1930
|Longest multiple-arch concrete highway bridge to span susquehanna river
Engineering Index Backfile | 1930
|Conowingo power plant, Susquehanna river
Engineering Index Backfile | 1928