Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods and equipment used in construction of 11.5-ft diam concrete lined tunnel on Tucumcari project, near Conchas Dam in New Mexico at record speed of 71 ft in three shifts.
Methods and equipment used in construction of 11.5-ft diam concrete lined tunnel on Tucumcari project, near Conchas Dam in New Mexico at record speed of 71 ft in three shifts.
Conchas canal tunnel record
Western Construction News
Stetson, C.B. (Autor:in)
1941
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Conchas dam and proposed tucumcari project
Engineering Index Backfile | 1939
Engineering Index Backfile | 1937
|Making concrete for Conchas dam
Engineering Index Backfile | 1938
Engineering Index Backfile | 1936
|