Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Continental divide tunnel
Methods and equipment used in driving first 8000 ft of water supply tunnel of Colorado-Big Thompson project, being built by U S Bureau of Reclamation, at average rate of 45 ft per day; tunnel design; drilling procedure; mucking procedure; ventilation.
Continental divide tunnel
Methods and equipment used in driving first 8000 ft of water supply tunnel of Colorado-Big Thompson project, being built by U S Bureau of Reclamation, at average rate of 45 ft per day; tunnel design; drilling procedure; mucking procedure; ventilation.
Continental divide tunnel
Western Construction News
1940
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Lining continental divide tunnel
Engineering Index Backfile | 1945
Investigations, design and starting of construction, Continental divide tunnel
Engineering Index Backfile | 1941
|Continental divide tunnel station 6 + 00 to station 72 + 00. Colorado-big Thompson project, Colorado
Engineering Index Backfile | 1940
On the Divide: Analytic and Continental Philosophy of Music
British Library Online Contents | 2017
|Berthoud pass section of victory highway over continental divide in Colorado
Engineering Index Backfile | 1927