Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wire chief's training course
Course covers all phases of telephone work. Mar n 3 p 17-18 + 32-35: Telephone plant records and maps. Apr n 4 p 36 + 59-62: Construction tools and trucks. May and June n 5 p 21-22 + 34-37 and n 6 p 19-20 + 32-36: Pole line design. July n 7 p 25 + 40-42: Pole line fixtures. Aug n 8 p 19-20 + 40-41: Pole guying. Sept, Oct and Nov n 9 p 22 + 38 + 40-41 + 47, n 10 p 39-40 + 63 + 66-68 and n 11 p 21-28 + 36 + 40: Open wire construction. Dec n 12 p 21-22 + 37-40: Drop wire construction.
Wire chief's training course
Course covers all phases of telephone work. Mar n 3 p 17-18 + 32-35: Telephone plant records and maps. Apr n 4 p 36 + 59-62: Construction tools and trucks. May and June n 5 p 21-22 + 34-37 and n 6 p 19-20 + 32-36: Pole line design. July n 7 p 25 + 40-42: Pole line fixtures. Aug n 8 p 19-20 + 40-41: Pole guying. Sept, Oct and Nov n 9 p 22 + 38 + 40-41 + 47, n 10 p 39-40 + 63 + 66-68 and n 11 p 21-28 + 36 + 40: Open wire construction. Dec n 12 p 21-22 + 37-40: Drop wire construction.
Wire chief's training course
Telephone Engr
Telephone Engineer ; 45
1941
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1943
Online Contents | 1995
|Online Contents | 1995
|Online Contents | 1994
|Online Contents | 1994
|