Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Shield tunneling on Chicago subways
Driving of 20,000 ft of single track tunnels, using four shields under compressed air, at average advance of 25 ft daily; removing concrete lined Chicago freight tunnel ahead of shields and backfilling with sand; primary lining with fabricated structural steel segments; mining out of areas for stations; design of shield tunnels; plant layout; shield operation.
Shield tunneling on Chicago subways
Driving of 20,000 ft of single track tunnels, using four shields under compressed air, at average advance of 25 ft daily; removing concrete lined Chicago freight tunnel ahead of shields and backfilling with sand; primary lining with fabricated structural steel segments; mining out of areas for stations; design of shield tunnels; plant layout; shield operation.
Shield tunneling on Chicago subways
Eng News-Rec
Engineering News-Record ; 126
1941
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1940
Engineering Index Backfile | 1943
Rapid transit subways for Chicago
Engineering Index Backfile | 1939
|The track elevation subways in Chicago
Engineering Index Backfile | 1914
|Development formulae for calculating ventilation for Chicago subways
Engineering Index Backfile | 1943
|