Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
River channel makes highway
Using 2 1/2 million cu yd of dredged material resulting from deepening of Columbia River channel for construction of hydraulic embankment of relocated Columbia River Highway between Troutdale and Dodson; construction procedure; completing rough grade.
River channel makes highway
Using 2 1/2 million cu yd of dredged material resulting from deepening of Columbia River channel for construction of hydraulic embankment of relocated Columbia River Highway between Troutdale and Dodson; construction procedure; completing rough grade.
River channel makes highway
Western Construction News
1941
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New interstate highway makes smallest state smaller
Engineering Index Backfile | 1957
Copper River Channel Migration and Its Effects on the Copper River Highway
British Library Conference Proceedings | 2008
|Engineering Index Backfile | 1928
Engineering Index Backfile | 1916
|