Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Caisson-type marine foundations support Derricks in lake Maracaibo
Practice of Lago Petroleum Corp on concession in District of Bolivar, Venezuela; use of wood piles is impractical because of insufficient lengths and because of presence of teredos; reinforced concrete piles used vary from 30 to 135 ft in length and 16 to 24 in. diam; dead load method of driving, in which precast concrete weights are placed on piles by floating cranes.
Caisson-type marine foundations support Derricks in lake Maracaibo
Practice of Lago Petroleum Corp on concession in District of Bolivar, Venezuela; use of wood piles is impractical because of insufficient lengths and because of presence of teredos; reinforced concrete piles used vary from 30 to 135 ft in length and 16 to 24 in. diam; dead load method of driving, in which precast concrete weights are placed on piles by floating cranes.
Caisson-type marine foundations support Derricks in lake Maracaibo
Oil Gas J
O'Donnell, J.P. (Autor:in)
Oil and Gas Journal ; 39
1940
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Derricks built on piles in Maracaibo Lake
Engineering Index Backfile | 1930
|Creole petroleum uses new Caisson foundations for oil wells in Lake Maracaibo
Engineering Index Backfile | 1944
Bridge spanning lake Maracaibo
Engineering Index Backfile | 1961
|Engineering Index Backfile | 1902
|Seismic properties of lake Maracaibo
Engineering Index Backfile | 1962
|