Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Elton tunnel -- National tunnel and mines completes difficult project
Notes on construction of tunnel at Tooele, Utah; objectives include drainage of mines, transportation of ore, men and supplies, conduct of water for irrigation, and aid in prospecting; features of gravel section, contact, and rock section; monthly progress; sources of trouble; performance and cost data; total length 24,040 ft.
Elton tunnel -- National tunnel and mines completes difficult project
Notes on construction of tunnel at Tooele, Utah; objectives include drainage of mines, transportation of ore, men and supplies, conduct of water for irrigation, and aid in prospecting; features of gravel section, contact, and rock section; monthly progress; sources of trouble; performance and cost data; total length 24,040 ft.
Elton tunnel -- National tunnel and mines completes difficult project
Min Contracting Rev
1941
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Iran completes its longest tunnel
Engineering Index Backfile | 1967
Lehigh valley completes musconetcong tunnel
Engineering Index Backfile | 1929
Online Contents | 2008
Difficult Start to Adler Tunnel
British Library Online Contents | 1997
|Concrete "Pot-Shots" line difficult tunnel
Engineering Index Backfile | 1954