Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods and equipment used in excavation of some 350,000 cu yd of solid rock for foundation of power plant, south of Needles, Calif, including 4 penstock tunnels 27 ft in diam.
Methods and equipment used in excavation of some 350,000 cu yd of solid rock for foundation of power plant, south of Needles, Calif, including 4 penstock tunnels 27 ft in diam.
Excavation for Parker Dam Power Plant
Reclamation Era
Johnson, T.R. (Autor:in)
Reclamation Era ; 30
1940
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Deep excavation for Parker dam
Engineering Index Backfile | 1937
Parker dam foundation excavation sets record depth of 250-ft
Engineering Index Backfile | 1937
Engineering Index Backfile | 1940
|Underground power plant excavation nears finish
Engineering Index Backfile | 1958
|Engineering Index Backfile | 1944